Se inició la construcción del proyecto Yu Gonggang del canal del río Xiangjiang, Soporte fuerte para excavadora SUNWARD

Se inició la construcción del proyecto Yu Gonggang del canal del río Xiangjiang, Soporte fuerte para excavadora SUNWARD

December 9, Xiangjiang River Channel Yu Gonggang project phase I project officially started, Hunan will add a new gateway to the sea Tongjiang. As the main force of construction, SUNWARD intelligent excavator spare parts appeared in the construction mobilization conference.

At the conference site, four SUNWARD excavator spare parts were neatly arranged and skillfully demonstrated. The equipment ran stably and acted smoothly, showing the safety and efficiency of SUNWARD intelligent products to the leaders and guests, which was praised by many times.

These four excavators are all the intelligent ACES in the excavation of SUNWARD, using the international famous brand high-power engine, large torque, strong power, at the same time equipped with mature and reliable hydraulic system and large displacement main pump, powerful mining, is also the first choice for construction. The relevant personnel of SUNWARD Intelligent excavator Business Department introduced that there will be more SUNWARD excavator spare parts to participate in the construction of Yugonggang project. The SUNWARD excavators has high quality excavator undercarriage parts, como rodillo guía,rodillo portador, rueda loca delantera,rueda de espigas,track chain assembly with track shoe, track adjuster/spring recoil, bucket teeth/adaptor, Cubeta, sello y junta, filter etc. It will contribute to the construction of Hunan Province and to the construction ofOne Belt and One Road”.

repuestos para excavadoras
repuestos para excavadoras

It is reported that the Xiangjiang River Channel Yugong Port project investment of about 5.16 billion yuan, the initial use of shoreline 1620 meters, a total of 12 berths and supporting construction of logistics park; About 3.22 billion yuan will be invested in the distribution and transportation system, and special railway lines and highways will be built. The project will be carried out in three phases. By the end of 2027, 12 berths will be fully completed and the port capacity will reach 28 million tons, forming a large-scale, modern and comprehensive multimodal transport hub port, providing a new platform and a new engine for Hunan to deeply integrate into the Yangtze River Economic Belt and the construction ofThe Belt and Road”, as well as creating a plateau of reform and opening up in inland areas.